Regulation
EC No 2037 / 2000 on substances that deplete the ozone layer.
Article 4. Paragraph 4
( V ) Fire Protection systems containing Halon shall be decommissioned before
the 31st December 2003.
Built it into your
budget ? Didnt know this? You had better sign up for the newsletter !
Facility Evaluation
Our facility evaluation provides a professional, unbiased assessment of your
data center operating environment and associated support systems. The facility
evaluation covers all aspects of the design, construction, maintenance, and
operation of the facility. Our evaluation will help reduce the risks of a
prolonged outage of data processing services.
Specific topics that are addressed include:
Physical Planning and Construction
The environment housing critical computer and communications equipment is
reviewed to identify potential hazards that may adversely affect ongoing
operations. Associated electrical and mechanical support equipment rooms and
areas are also included in this portion of the review.
Mechanical Systems
The facility heating, cooling, air conditioning, ventilation, and plumbing
systems, which support data processing and other critical operations, are
reviewed. Emphasis is placed on the mechanical systems’ design and
installation for the adequacy, redundancy, and reliability to sustain continuous
operations.
Electrical Distribution Systems
The electrical systems serving the data center and other critical areas are
reviewed to determine potential single points of failure that may affect ongoing
operations. Capacities of equipment are also evaluated to determine the adequacy
for accommodating future growth requirements.
Fire Protection Systems
The facility fire detection, alarm, and suppression systems are reviewed. The
effectiveness of the overall systems is reviewed together with maintenance,
personnel training, and responsive actions.
The Facility Evaluation
- Identifies potential failure modes and threats to critical operating
environments.
- Determines whether support systems can be maintained and serviced without
interfering with the normal operations of critical computer and
communications systems.
- Determines physical requirements for computer and communications growth
and equipment upgrades.
- Provides recommendations for facility corrective actions that complement
disaster recovery programs.
- Provides conceptual planning and development of construction budgets to
minimize existing single points of failure.
At the completion of the evaluation, we prepare a formal report and review.
Budgetary costs for the recommendations are also developed. The report provides
the customer with a better understanding of conditions or events that could
potentially disrupt operations and identifies limitations of the facility and
support systems that could impede future growth.
Implementation of the recommendations for enhancements or modifications to
the facility will result in a more secure and reliable operating environment. We
present the findings of the evaluation in a formal presentation to senior
management.
For budgetary pricing contact :
Back to main page :
: http://www.businesscontinuityinternational.com
Keep
informed on breaking news from around the globe including regulatory its free
!

Sign up to Business Continuity
Internationals User group at Yahoo!

|